The supplier must wire all the pipes designed to the new building under construction and build the network. f The supplier must transfer information wiring from the Tsukuba University, which there is in the medical information bureau of current outpatient department ridge 3F in a server‐room in the new building. g The supplier must transfer the information wiring from Proton Medical Research Center and Center for Medical Education and Training, which there is in the medical information bureau of current outpatient department ridge 3F in a server‐room in the new building. h The supplier must attach wiring having a direct line for data shifts between the medical information system servers in the medical information bureau of current outpatient department ridge 3F and server‐room in the new building. i The supplier must attach wiring having a direct line between the serverroom in the new building and each floor switches of the existing medical information network. j The supplier must build VPN connection from the network of the pharmacy section system to the satellite pharmacies that there are in each ward of the new building. k We can identify the point of network obstacles such as outbreak or Loop of the traffic in large quantities in real time, and the supplier must build monitoring/the prevention system which an obstacle does not spread to in all networks. l The supplier must get the feeding system enabling automatic reshuffling in emergency power supply system and general power supply system ready to be able to cope with a feeding disorder including rolling blackouts about all network apparatuses. 平成  年  月  日 金曜日 官 報 (号外政府調達第  号) e The supplier must make two folds of medical information networks it and build it. n The network adapting to guidelines on medical information system Ver4.1 remote service security guidelines Ver.2.0 guidelines about the safety management when ASP/SaaS enterprise handles medical information which Ministry of Health, Labour and Welfare/Ministry of Public Management, Home Affairs, Posts and Telecommunications establishes about the safety management. o The network must have a quarantine inspection system covering the whole. p The supplier must build the structure which detects promptly and cannot perform network use, when apparatus other than the permitted apparatus is connected to a network. q The supplier must let our office work system network extend in the place where we specify, and the medical information system network and the office work network let you separate physically. r The supplier must build university hospital medical information network research center (UMIN center) and VPN connection environment s The supplier must build VPN connection from Tsukuba University Hospital to clinical education research centers in Ibaraki areas. ‘ Time limit for the submission of the requested material : 5 : 00 PM 31, January, 2012 a Contact point for the notice : Noboru Sawabe, First Section of Contract, Division of Finance, Department of University Hospital Management, University of Tsukuba, 2‘1‘1 Amakubo Tsukuba‐shi 305‘8576 Japan, TEL 029‘853‘3542 m 開催日時 平成23年12月22日13時30分 開催場所 信州大学医学部附属病院外来棟 研修室5 次のとおり物品の導入を予定していますので、 5 その他 この導入計画の詳細は導入説明書に 当該導入に関して資料等の提供を招請します。 よる。なお、本公表内容は予定であり、変更す 平成 23 年 12 月 16 日 ることがあり得る。 国立大学法人信州大学理事 三浦 義正 6 Summary ◎調達機関番号 415 ◎所在地番号 20 ¥ Classification of the products to be pro〇第1号 cured : 22, 31 1 調達内容 ] Nature and quantity of the products to be ¥ 品目分類番号 22、31 rent : Automated Laboratory System for ] 導入計画物品及び数量 総合臨床検査シス Sample Transportation and Analysis 1 Set テム 一式 ^ Type of the procurement : Rent ^ 調達方法 借入 _ Basic requirements of the procurement : _ 導入予定時期 平成24年度12月以降 A The demand system analyzes and ana‘ 調達に必要とされる基本的な要求要件 lyzes biochemistry and immune serum inA 要求システムは、生化学・免疫血清検査 spection (a sample pretreatment, post(検体前処理、後処理、検体搬送ラインを processing, and a sample carrier line are 含む) 、血液細胞検査、血液凝固線溶検査、 included), a blood‐cells inspection,a co尿定性・沈渣検査、 血糖・HbA1c検査、 agulo‐fibrinolytic inspection, urine qual微生物検査、遺伝子検査、各種精密分離分 ity and a crust inspection, blood sugar 析検査を高精度に分析・解析できること。 and a HbA1c inspection, a microorganB 要求システムは、本院が行う上記検査を ism test, genetic screening, and various 遅滞なく処理する検査処理能力を有するこ precision separation analysis inspections with high precision. と。 B The demand system should have the C 要求システムは、本院の電子カルテを中 inspection throughput which processes 核とした既存の病院情報システムとオンラ without delay the above‐mentioned inイン接続機能を有し、 患者情報・依頼情報、 spection which this hospital conducts. 数値データ、画像データの入出力通信が可 C The demand system should have the 能で、データ保存・管理ができること。 existing hospital information system and D 時間外検査に用いる分析装置は、24時間 online connection function which made 稼動が可能なこと。 the core the electronic medical recording 2 資料及びコメントの提供方法 上記1]の物 systemof this hospital,and input‐and‐out品に関する一般的な参考資料及び同‘の要求要 put communication of patient infomation 件等に関するコメント並びに提供可能なライブ and request information, digital data, and ラリーに関する資料等の提供を招請する。 image data be possible for it, and perform ¥ 資料等の提供期限 平成24年2月1日17時 datastorage and management. 15分(郵送の場合は必着のこと。 ) D The analysis equipment used for a late ] 提供先 〒390‘8621 松本市旭3‘1‘1 inspection is that 24‐hour operation is 信州大学医学部附属病院企画マネジメント possible. 課契約室 紙谷 康弘 電話0263‘37‘2746 ‘ Time limit for the submission of the re3 説明書の交付 本公表に基づき応募する供給 quested material : 5 : 15 PM 1, February, 者に対して導入説明書を交付する。 2012 ¥ 交付期間 平成23年12月16日から平成24年 a Contact point for the notice : Yasuhiro 2月1日まで。 Kamiya, Procurement Section. Accounting ] 交付場所 上記2]に同じ。 Division. Shinshu University Hospital, 3‘ 4 説明会の開催 本公表に基づく導入説明会を 1‘1 Asahi Matsumoto‐shi 390‘8621 Japan, TEL 0263‘37‘2746 開催する。 資料提供招請に関する公表 ¥ ]